What is new in each Vulcan release. Every overheating run records its engine build and input generator version.
17 November 2026
HEM:EPC
- Existing buildings without an air test now run. Enter open fireplaces, the double-glazing installation period and, for flats, a heat loss corridor in Global Settings > Air tightness.
- Existing buildings: roof, floor and outside-surface details, including insulation location and thickness, thatched roofs, floor insulation, and surface material and finish or colour.
- Existing walls with an applied build-up send the build-up to HEM:EPC as wall layers.
- Battery grid import limit for charging, and slab edge insulation by thickness and material.
- The dwelling's length, width, ground floor area and storeys go to the calculation.
- New defaults where an input is not stated: combi daily hot water from occupancy, uninsulated solid floors, XPS edge insulation 0.036 W/m·K, heat pump coil upper flow limit 60 °C, and mixed emitters take the first emitter's design flow temperature. Each shows as "(default)".
- Suspended floors take wind sheltering from the site shield class.
- Isle of Man postcodes and walls pitched from 60° to 120° are accepted.
- Results, the Quick sim card and the target picker say why EPC figures are a preview.
- Existing buildings: set opening type and close shading for several windows at once; the ventilation zone height and storey count show the values the calculation uses.
- Heated basements: new build uses the whole-basement method; HEM:FHS uses the floor alone.
Geometry
- A ground floor that states R but no U gets its U-value by BS EN ISO 13370, as BR 443 applies it.
- Element and PV heights go to HEM above ground. Draw the dwelling at 0 or at its base height.
- Details uses the full canvas height, panels open below the File bar, and the Quick sim card stays clear of the drawing.
-
- Element asks for the type first and places the new element at the view centre.
- A link to a field inside a closed "More" group opens the group.
- New Model starts as an existing EPC, a new-build EPC or an FHS model. Switch between existing and new build under the HEM version in Global Settings.
- A HEM:FHS model that gives a solar absorption coefficient is asked to set the colour instead.
Overheating (preview)
- TM59 (2026) is available, with a pass or fail from its stages.
- The evidence report prints the run date and the modeller's account name.
- New help pages: Overheating guide and Overheating: validation and conformance.
- Easily accessible windows come from the geometry (Approved Document O Appendix A).
- A raised flat with no Storey of dwelling counts as first floor or above from 2 m above the ground.
- Wind exposure follows the project's HEM terrain class (default Suburban).
- Room volume follows the room's surfaces under pitched and hipped roofs.
- HEM vents are modelled on every route.
- MVHR "Has a summer bypass": bypass from May to September.
- Bedrooms: "Windows closed at night for noise" (23:00–07:00).
- Homes with more than 3 bedrooms get occupant gains pro rata (TM59:2017).
- The report adds results without blinds, for information, and labels DSY2 and DSY3 runs as sensitivity runs, in Quick sim and the batch summary too.
- Part O simplified method: the nation comes from the postcode; border districts ask.
- EnergyPlus engine update: stair openings between floors run with windows shut.
MCP helper and Analyst
- MCP helper 0.3.2 and Analyst alpha.17 are smaller downloads.
